GLOVE FACTORY FOR PETCHEM INDUSTRIAL PARK, TANJUNG KIDURONG, BINTULU
PROPOSED GLOVE FACTORY FOR PETCHEM INDUSTRIAL PARK, TANJUNG KIDURONG, BINTULU, SARAWAK (SARAWAK MEDICAL INNOVATION & TECHNOLOGY HUB(SMITH)
PROPOSED GLOVE FACTORY FOR PETCHEM INDUSTRIAL PARK, TANJUNG KIDURONG, BINTULU, SARAWAK (SARAWAK MEDICAL INNOVATION & TECHNOLOGY HUB(SMITH)
PERLAKSANAAN PROJEK PEMBANGUNAN SEMULA SEKOLAH DAIF DI NEGERI SARAWAK DI BAWAH PERUNTUKAN RM1 BILION (FASA 2) PAKEJ 11
PERLAKSANAAN PROJEK PEMBANGUNAN SEMULA SEKOLAH DAIF DI NEGERI SARAWAK DI BAWAH PERUNTUKAN RM1 BILION (FASA 2) PAKEJ 11
Construction of new Transmitting 132kV double busbar substation which comprises of major equipment such as 132kV Indoor Gas Insulated Switchgear (GIS), 120MVA 132kV/33kV power transformer, earthing transformer and complete AC & DC power system.
Scope of Works (Civil)
Includes all building structural, architectural and building M&E works; demolition of existing structures, earthwork, foundations, cable trenches, infrastructure including road, drain, fence, water reticulation, oil interceptor, retaining wall and sound barrier wall (if required).
Existing Transmitting 33/11kV GIS Substation, Civil Works: Complete Civil Works consisting of hacking of the existing building wall and slab for cable trench entry, relocation or make good of chainlink fence, cable trench construction and associated works.
Existing Old Transmitting 33/11kV outdoor switchyard, Civil Works: Dismantling and demolishing of existing structure and foundation, road, cable trench, oil interceptor and etc for earthwork preparation for new Transmitting 132kV Substation.
Existing small local substation/RMU, Civil Works; Dismantling works on the existing cover shed and earthmast steel structure, upgrading of the existing chainlink fence to match new/existing brick fence with door/gate and associated civil works.
CADANGAN PEMBINAAN GANTIAN PENUH 18 BILIK DARJAH DAN 6 UNIT RUMAH GURU DAN LAIN-LAIN KEMUDAHAN DI
SEKOLAH KEBANGSAAN SUBA BUAN, BAU, SARAWAK.
PROPOSED BIDAYUH CULTURAL VILLAGE REDEEMS CENTRE, ON LOT 628, BLOCK 5, SENGGI-POAK, L.D SINGAI BAU
PROJECT BRIEF
- Site is located along Jalan Saratok-Jakar.
- Consortium with GE for engineering, construction, erection and Testing & Commissioning of a new Serudit 275/132/33kV Substation.
SCOPE OF WORKS
Complete civil works consisting 275kV of engineering and construction of:-
1) 275kV Control Building
2) 33/11kV Control Building
3) Guard House
4) All building structural, architectural and building M&E Works
5) Piling
6) Foundations
7) Cable Trenches
8) Infrastructure Works